I-35W Bridge
Minneapolis, MN
PRODUCTS USED:
- BASF Degadeck Crack Sealer Plus
GENERAL CONTRACTOR: Flatiron / Manson Construction, Denver, CO
SUPERINTENDENT: Randy Svilar
ARCHITECT: Figg Engineering Group, Tallahassee, FL
PROJECT NOTES: Following the collapse of the I35W Bridge, MN DOT and Flatiron Construction set out to build a new segmental post tensioned bridge. Unlike other post tensioned bridges, this did not have a high density concrete overlay. Instead the driving surface would be built into the segmental form. After grinding a surface profile onto the bridge deck, Flatiron chose to seal the surface with a reactive methacrylate penetrating sealer. Using Degadeck Crack Sealer Plus allowed Flatiron to seal any micro cracking that may have occurred below the surface of the bridge deck.

